Showing posts with label tiling. Show all posts
Showing posts with label tiling. Show all posts

01 October 2011

Week 25

I couldn't wait till the end of the 25th week to post!

Pre-handover meeting went really well, we love our house!! =)

Barely anything to fix or touch-up so we should have our keys in 5 sleeps......WOOHOO!!

Some pics......
Our facade with the garage door down =)

Flyscreens are on...this one is going to give us a headache though lol

More flyscreens, sorry a bit boring! Onto more exciting pics...
Our ensuite all finished...

so happy with the end result =)
The completed bathroom...

again, very happy with the end result =)
Laundry and WIL =)
Can't forget the dunny!
The robes in Bed 3 & 4

The robes to Bed 2 & 5
The kitchen appliances...

in our finished kitchen =)
 Packing has started......can't wait for our keys!!

14 September 2011

Week 22

We are so impressed with how much has been done this week and very happy with how it's all coming together =)

The tiling is finished

Kitchen splashback


Ensuite
Laundry
Bathroom

Painting has also been completed





We had some deliveries
Pavers!!

An attempt to see how the colours look together

Kitchen appliances and gas HWS

Dunnies!

Both the Plumber and Electrician have installed their final bits and pieces and we also have door handles (some pics through windows for now)




Hmmm......not much left to do =)
Exciting!!

04 September 2011

Week 21

Unfortunately not too many pics to share this post. With a combination of winter bugs and work commitments, neither of us has been able to make it to the house whilst the tradesmen have been onsite, so we've had to settle with looking through the windows at any inside progress.

Despite not being able to get in, we were excited to see the tiling had started with the Laundry almost done and our Ensuite shower under way, I love our feature tile =). It also seems the painters have finished the doors, door frames and shelf timbers. I took some pics, but dirt or reflection didn't play nice and most didn't turn out. I can't really not post a pic though, so I have one that I suppose turned out semi-ok (it's not great, but the best I could do for now).

The Ensuite tiling......

 One wall of the shower done in the feature tile (see below)
A pic of the feature tile used

We were thrilled to see the painters have also made a start outside......



And the garage floor now looks prepped for the grano


Hopefully we will get to look inside soon and take some decent pics of the tiles =)

Update: 6 September 2011
Since technically it's still the 21st week, I figured these belong here......
Inside pic of the Ensuite =)
Something new ~ Kitchen splashback =)
The only pic that includes the finished paintwork to the doors
The Laundry which has the same feature tile as the Ensuite

The new garage floor

Yay for inside photos, thanks to the tiler and lamingtons hehe!

And another thanks to our SS who let us move the feature tiles in the laundry and change the grout colour to our feature tiles on the ensuite shower wall and bath hob =)