21 September 2011

Week 23

So, so close now to finishing =)

Our driveway and alfresco have been paved, the plastic coating to the windows and doors have been removed, the overhead cabinet doors have been installed in the kitchen and the insulation batts were delivered ready to go in the roof......
Prepped & ready to go
Yay...half a driveway

Crossover will be done after handover
The alfresco has a floor =)


Kitchen complete, almost time to remove the blue plastic =)
Our much needed insulation

Can't wait for our pre-handover meeting =)

14 September 2011

Week 22

We are so impressed with how much has been done this week and very happy with how it's all coming together =)

The tiling is finished

Kitchen splashback


Ensuite
Laundry
Bathroom

Painting has also been completed





We had some deliveries
Pavers!!

An attempt to see how the colours look together

Kitchen appliances and gas HWS

Dunnies!

Both the Plumber and Electrician have installed their final bits and pieces and we also have door handles (some pics through windows for now)




Hmmm......not much left to do =)
Exciting!!

18 July 2011

Week 14

The electricians have been in to run their cables and install the power point boxes. We opted for an Intelligent Homes Package so there were a few extra cables to look at =)
Cables and power boxes for the GPO's

Part of our IH package...for outside speakers and TV

Our smart wiring panel will be here...lots of cables!
Gutters are on and downpipes to the rear and sides of the house have also been installed.
Gutters =)
And again!


Downpipes delivered...
and installed!
 
And last but not least we had an exciting delivery at the end of the week......our colorbond =)
Colorbond "Monument"
The "hats" for our exhausts

02 July 2011

July 2011 - Week 12

Brickies finished, cleaned up, packed up and left Monday......and they left it looking spotless, even swept the floor! Unfortunately they still forgot Bedroom 4's robe recess, but our SS and his brickie team had already scheduled a time for them to come back before I'd even contacted him.

Finished fridge recess (and the broom)

Our Living areas looking very clean


The very same day we had some more deliveries for our roof!

To our surprise, the tradies made a start on our roof frame in the wind and pouring rain......impressive!



High ceilings to our Living areas =)

Our Alfresco has high ceilings too =)


Our future outdoor entertaining area