14 September 2011

Week 22

We are so impressed with how much has been done this week and very happy with how it's all coming together =)

The tiling is finished

Kitchen splashback


Ensuite
Laundry
Bathroom

Painting has also been completed





We had some deliveries
Pavers!!

An attempt to see how the colours look together

Kitchen appliances and gas HWS

Dunnies!

Both the Plumber and Electrician have installed their final bits and pieces and we also have door handles (some pics through windows for now)




Hmmm......not much left to do =)
Exciting!!

18 July 2011

Week 14

The electricians have been in to run their cables and install the power point boxes. We opted for an Intelligent Homes Package so there were a few extra cables to look at =)
Cables and power boxes for the GPO's

Part of our IH package...for outside speakers and TV

Our smart wiring panel will be here...lots of cables!
Gutters are on and downpipes to the rear and sides of the house have also been installed.
Gutters =)
And again!


Downpipes delivered...
and installed!
 
And last but not least we had an exciting delivery at the end of the week......our colorbond =)
Colorbond "Monument"
The "hats" for our exhausts

12 July 2011

Week 13

We have reached what should be the half way point this week......yay!!
The house has been buzzing with tradesmen and there has been lots of progress. The roof frame was completed, fascias installed, blue thingies put on (have no idea what they are lol), eaves and ceilings to the Alfresco and Garage are up, the plumbers got busy installing all the pipes and the sparkies chased (?) the walls ready for wiring =)
Alfresco ceiling and eaves
Fascia and the blue thingies lol

Roof frame is complete


Ensuite

Kitchen

Bathroom
Outside tap

The brickie team also came back and finished the nib wall to the robe in Bed 4 =)


Not long now before we get a roof cover......exciting!!