29 August 2011

Week 20

We are well and truely tightly locked out now! The only way to get in is to go when the tradies are there!

Lucky for us, there were plenty of opportunities this week =)

Lots of exciting progress!!!

Painting undercoat to door frames, doors, ceilings and cornices......




Deliveries......

Tiles

Bath, basins and ensuite benchtop

Ensuite cabinets

Overhead cabinets, rear kitchen bench and sink
Kitchen island cabinets
Rear kitchen cabinets and kickboards

We also met with our supervisor this week. If all runs smoothly and to schedule, we hopefully will be meeting him again the last week of September/early October for our Pre-handover......YAY!! While there we got to check out our installed cabinets =)......

Ensuite cabinets with benchtop, basins and tapware
Bathroom cabinets also all done and the bath in place

Showers don't look so small now with the white waterproofing applied
Laudry cabinets with benchtop, trough and tapware
The KITCHEN =)

With overheads, benchtops, kickboards, sink and tapware!
Island bench with spaces for microwave and DISHWASHER =)

Rear island bench with spaces for 900mm oven and cooktop

I just want to rip that blue stuff off the benches lol, very happy with our choices so far =)

21 August 2011

Week 19

I may not have as many photos of the inside to share from now on, we have lovely green doors preventing us from entering the house......

YAY LOCK UP!!



But it didn't stop me this week, I managed to get in =)

All internal doors are installed and shelving to Pantry, Linen and Robes have been put in. Our showers now have hobs and we are pretty certain our external bricks have been cleaned (well they look cleaner). I hope the showers feel bigger than they look, I wasn't going to stand in them and get cement on my shoes so fingers crossed their size is an optical illusion!

Our Entry...happy, happy!
Our gorgeous Theatre doors
Pantry shelving
Our Robe

Bed 4's Robe (Bed 3's is the same)


Bed 5's Robe (Bed 2's the same)
Linen shelving
Shower hobs...Ensuite on the left, bathroom on the right...eek!

Hmmm...look cleaner?

I think so =)

16 August 2011

Week 18

Ceilings and cornices are finished and "wow" what a difference they make to the feel of the rooms =)

Entry
Bed 1

WIR & Ensuite

Theatre
Kitchen/Living

Hallway

Bed 2
Laundry

WIL & WC

Bathroom (we extended under the eaves)

Bed 3
Bed 4

Bed 5

Living areas

Love the large open feeling the raised ceilings give =)

07 August 2011

Week 17

Well in comparison to last week......not a lot has been done this week.

BUT, it's still progress!!

Gyprock is up, we have ceilings......



Cornices are waiting patiently to be installed (definitely more patient than me)!


"C'mon Lock-up"