24 June 2011

Week 5

With the slab needing time to cure, it's time to talk "business"......of the toilet kind! This week we had our septics installed. Being an older established area meant the block did not have connection to sewrage.

First up the septic system was delivered


The holes were dug


Then in the ground they went



Lastly they are all covered up and the job is done!


After looking at our drawings......again lol, I decided some of the cabinets would look and function better if we changed the direction in which they opened. I sent a request through to our construction coordinator not thinking I will have much luck since construction had already started. A big thankyou to our CC and our SS for a prompt reply basically saying no problem! =)